Haemonetics - Computer Room —
Braintree, MA
New air conditioning and Inergen suppression system.
Northern Lights — Woburn, MA
12,000 square foot Data Center and NOC with N+1 redundancy
for a 24/7 system. Project included Inergen suppression system,
full A/C monitoring and two (2) generators (gas and diesel).
Network Plus — Randolph, MA
3,000 square foot NOC and 8,000 square foot Customer Service
with full UPS and generator system.
Total Site Solutions — Massachusetts/New
Hampshire
10,000 square foot project in Boston, Massachusetts.
3,000 square foot project in Manchester, New Hampshire.
NEON - Northeast Optic Network —
Woburn, MA
4, 000 square foot Data/Communications Room, Video Conference
Room and Network Operations Center. Project included dedicated
HVAC system, pre-action sprinkler and Inergen systems, electrical
distribution including a 65 kva UPS package and a 250kW generator.
FISERV — Braintree, MA
30,000 square foot Data Center with raised floor. Design included
Liebert HVAC equipment with 100% redundancy, dry sprinkler
system, 500 kva standby generator and a 300 kva UPS System.
Massachusetts Lottery Building —
Braintree, MA
15,000 square foot Data Center with raised floor. Design included
electrical distribution for new computer system. All existing
UPS and generator ratings evaluated to support new loads.
Rhode Island Lottery — Cranston,
RI
8,000 square foot Data Center and Support Offices. Design
included new HVAC, Electrical, Plumbing and Fire Protection.
Liebert Units with 50% redundancy utilized in Computer Room,
rooftop units for all support spaces. The entire facility
is supported with a 250 kva standby generator. A 100 kva UPS
System was provided for the main computer equipment.
Navisite — Andover, MA
Completed Schematic and Preliminary design services for a
60,000 square foot Data Center Facility. System design criteria
included 7/24 operation with Network Operations Center.
Boston Financial Data Services (BFDS)
— Braintree, MA
8,000 square foot raised floor Computer Room. 375 kva UPS
System with 600 kW generator backup. Facility provided with
raised floor Computer Room HVAC units and FM 200 extinguishing
system.
Media One — Massachusetts/New
Hampshire
Numerous head end and studio projects throughout the New England
region. Typically building size of 8,000 square feet. Facility
systems comply with 7/24 requirements.
|